Takitimu North Link

Temporary Guardrail Installation

Fulton Hogan Limited and Heb Construction Limited Joint Venture
Currently In progress

We have been engaged to carry out part of the work comprised in the Head Contract for the Takitimu North Link project. PPS work to be carried out is for temporary guardrail with either supply and install or install only or removal as required for works located at the Cambridge Road/ Harrison Road intersection, with the length approximately 400m and at SH29 Takitimu Drive, length approximately 920m. Further sections may be added where required.