<?xml version="1.0"?>
<rss version="2.0" xmlns:atom="http://www.w3.org/2005/Atom">
   <channel>
      <title>Blog www.ppsfencing.co.nz</title>
      <link>http://www.ppsfencing.co.nz/blog/</link>
      <description>The latest Blog feeds from www.ppsfencing.co.nz</description>
      <language>en-us</language>
      <pubDate>Thu, 23 Apr 2026 15:02:42 +1200</pubDate>
      <generator>Rocketspark</generator>
      <atom:link href="http://www.ppsfencing.co.nz/blog/rss/" rel="self" type="application/rss+xml" />
      	      <item>
	         <title>Te Ahu a Turanga: Manawatū Tararua Highway</title>
	         <link>http://www.ppsfencing.co.nz/blog/post/152618/te-ahu-a-turanga-manawatu-tararua-highway/</link>
	         	         <description>Te Ahu a Turanga: Manawatū Tararua Highway is a 11.5km route to reconnect the Manawatū, Tararua District, Hawke’s Bay and northern Wairarapa. This new highway replaces the closed State Highway 3 Manawatū Gorge route. PPS installed the permanent safety barriers for W-section Barriers and Flexible Safety Barriers....</description>
	         <pubDate>Tue, 23 Sep 2025 14:40:04 +1200</pubDate>
	         <guid>http://www.ppsfencing.co.nz/blog/#post152618</guid>
	      </item>
      	      <item>
	         <title>Solar Farm Security Fencing Projects</title>
	         <link>http://www.ppsfencing.co.nz/blog/post/133664/solar-farm-security-fencing-projects/</link>
	         	         <description>At PPS Fencing, we’re proud to support New Zealand’s growing renewable energy sector with secure, reliable, and large-scale fencing solutions. Solar farms demand high-performing security perimeters to protect valuable infrastructure, and our team has delivered on some of the country’s biggest projects.Through the installation of extensive security fencing and custom-fabricated gates, we’ve helped leading energy providers safeguard their solar investments....</description>
	         <pubDate>Fri, 19 Sep 2025 00:00:00 +1200</pubDate>
	         <guid>http://www.ppsfencing.co.nz/blog/#post133664</guid>
	      </item>
      	      <item>
	         <title>Barrier Repair Service - Transmission Gully Expressway</title>
	         <link>http://www.ppsfencing.co.nz/blog/post/133363/barrier-repair-service-transmission-gully-expressway/</link>
	         	         <description>We have been awarded the maintenance package for wire rope and guardrail barriers after completing the installation of these barriers for CPB Heb Joint Venture in 2022. The maintenance is for repair and any new installations of these road safety barriers on the Transmission Gully Motorway. This motorway is 27 kilometres long and is located north of Wellington....</description>
	         <pubDate>Sun, 01 Jan 2023 00:00:00 +1300</pubDate>
	         <guid>http://www.ppsfencing.co.nz/blog/#post133363</guid>
	      </item>
      	      <item>
	         <title>Boundary Fencing - Peka Peka to Otaki Expressway</title>
	         <link>http://www.ppsfencing.co.nz/blog/post/133369/boundary-fencing-peka-peka-to-otaki-expressway/</link>
	         	         <description>The aim of this project is to remove congestion points for through-traffic consisting of 4 lanes and helping to improve journey time reliability through the Kāpiti Coast area, and to increase all safety aspects. This will revolutionise the efficiency of freight and people movements between Wellington heading north. It will greatly assist in facilitating economic productivity and growth in the area. We are working in conjunction with the stakeholders to complete some of the various fencing proje...</description>
	         <pubDate>Sun, 01 Jan 2023 00:00:00 +1300</pubDate>
	         <guid>http://www.ppsfencing.co.nz/blog/#post133369</guid>
	      </item>
      	      <item>
	         <title>Fencing - New Zealand Transport Agency</title>
	         <link>http://www.ppsfencing.co.nz/blog/post/133370/fencing-new-zealand-transport-agency/</link>
	         	         <description>We have developed a strong commercial relationship with Colliers International and worked alongside them for numerous years. PPS complete repairs and maintenance and installation of new fencing requirements of all types on tenant properties managed by Colliers International throughout the greater Waikato region.&amp;nbsp; &amp;nbsp;...</description>
	         <pubDate>Sun, 01 Jan 2023 00:00:00 +1300</pubDate>
	         <guid>http://www.ppsfencing.co.nz/blog/#post133370</guid>
	      </item>
      	      <item>
	         <title>Takitimu North Link - Temporary Guardrail Installation</title>
	         <link>http://www.ppsfencing.co.nz/blog/post/133368/takitimu-north-link-temporary-guardrail-installation/</link>
	         	         <description>We have been engaged to carry out part of the work comprised in the Head Contract for the Takitimu North Link project. PPS work to be carried out is for temporary guardrail with either supply and install or install only or removal as required for works located at the Cambridge Road/ Harrison Road intersection, with the length approximately 400m and at SH29 Takitimu Drive, length approximately 920m. Further sections may be added where required....</description>
	         <pubDate>Sun, 01 Jan 2023 00:00:00 +1300</pubDate>
	         <guid>http://www.ppsfencing.co.nz/blog/#post133368</guid>
	      </item>
      	      <item>
	         <title>Installation of permanent Safety Barriers (Wire Rope and W-Beam)</title>
	         <link>http://www.ppsfencing.co.nz/blog/post/133364/installation-of-permanent-safety-barriers-wire-rope-and-w-beam/</link>
	         	         <description>The Transmission Gully Motorway is a 27 kilometre long, four lane motorway north of Wellington, New Zealand; and it forms part of the State Highway 1 route. As part of the Northern Corridor, it provides safe, efficient, and reliable travel in and out of the Wellington Region. PPS installed the permanent safety barriers for wire rope and w-beam.Our hydro excavation truck was utilised through this project for the varying ground conditions and safe excavation around utilities and underground servic...</description>
	         <pubDate>Sat, 01 Jan 2022 00:00:00 +1300</pubDate>
	         <guid>http://www.ppsfencing.co.nz/blog/#post133364</guid>
	      </item>
      	      <item>
	         <title>Supply and Install Guardrail Barrier - SH39</title>
	         <link>http://www.ppsfencing.co.nz/blog/post/133376/supply-and-install-guardrail-barrier-sh39/</link>
	         	         <description>The Mangaotama Stream Bridge on SH39, Ngahinapouri required deck and beam replacement and our involvement in this project was removing existing guardrail barriers and supply and install new leading end terminals, w-section and thriebeam transitions connected to the bridge.&amp;nbsp;...</description>
	         <pubDate>Sat, 01 Jan 2022 00:00:00 +1300</pubDate>
	         <guid>http://www.ppsfencing.co.nz/blog/#post133376</guid>
	      </item>
      	      <item>
	         <title>Supply and Install Temporary ﻿and Permanent Fencing</title>
	         <link>http://www.ppsfencing.co.nz/blog/post/133372/supply-and-install-temporary-and-permanent-fencing/</link>
	         	         <description>PPS supplied and installed temporary and permanent fencing, which included flood gates, drain crossings, culvert headwalls, post and rail and cycleway fencing along with the construction of multiple retaining walls and noise walls throughout the project....</description>
	         <pubDate>Sat, 01 Jan 2022 00:00:00 +1300</pubDate>
	         <guid>http://www.ppsfencing.co.nz/blog/#post133372</guid>
	      </item>
      	      <item>
	         <title>Supply and Installation of W-section Barriers and the Installation only of Flexible Safety Barriers</title>
	         <link>http://www.ppsfencing.co.nz/blog/post/133371/supply-and-installation-of-w-section-barriers-and-the-installation-only-of-flexible-safety-barriers/</link>
	         	         <description>The 22km four lane Hamilton by-pass is now open, taking SH1 traffic east of Hamilton City. PPS supplied and installed W-Section road safety barriers and installed flexible safety barriers through five of the seven sectors of the project.Our hydro excavation truck was used on this project for the varying ground conditions, constructing trenches and the use of safe excavation around utilities and underground services....</description>
	         <pubDate>Sat, 01 Jan 2022 00:00:00 +1300</pubDate>
	         <guid>http://www.ppsfencing.co.nz/blog/#post133371</guid>
	      </item>
         </channel>
</rss>
